Illustrative renderingProjects
The kinds of data center work MavenAI is organized to coordinate, with the typical scope and the first thing to settle on each. These describe project types, not completed projects.
Project types
Greenfield campus
Land, civil works, utility service and the first data halls, planned for later phases.
Settle first: Confirm utility path, entitlement route and the order of buildings.
Hall expansion beside live operations
New capacity next to a running facility, including tie-ins to existing systems.
Settle first: Map outage risk, access control and the windows for each tie-in.
Powered land development
Site preparation and infrastructure that make a parcel ready for a building program.
Settle first: Establish what the utility can serve, when, and on what terms.
High-density AI and GPU hall
Power distribution and cooling designed around dense compute.
Settle first: Fix the load basis and cooling approach before releasing long-lead equipment.
Modular deployment
Factory-built modules, site pads, utilities and field integration.
Settle first: Split factory scope from site scope and set one interface schedule.
Owner’s representation on a project in progress
Independent oversight of schedule, cost, contracts and turnover.
Settle first: Baseline where the project stands and list the decisions already late.
Planning something like this?
Tell us the location, expected load, stage and what is still undecided.